Order in Appeal No. 91 of 2013
Summary:
Capacitor surcharge — non-installation of capacitors — LT II consumer with a contracted demand of 5.26 kW — levy of — for the period 08/2012 to 07/2013 — without an inspection of the premises — held invalid. A notice has to be issued on inspection of the premises giving reasonable opportunity of being heard to the consumer before levying the capacitor surcharge.